Foundry Magazine
Foundry Channels
  METALS & ALLOYS   MELTING   REFRACTORIES   SAND & BINDERS   POURING & FILTERING   COREMAKING   MOLDING   SIMULATION   AUTOMATION   PROCESS CONTROL   SHAKEOUT, CLEANING,
  & FINISHING
  HEAT TREATING   TESTING, MEASURING,
  & QUALITY CONTROL
  ENVIRONMENT, HEALTH,
  & SAFETY
USEFUL LINKS SUBSCRIPTIONS CONTACT US
 
ETA Completes APC System for Tyler Pipe
By FMT Staff | Published February 22, 2005
Reprints  |   Printer Friendly
  |   Email a Friend

Controls emissions with O2 enrichment
ETA Engineering reports it has completed a contract placed by Tyler Pipe Co. to design and build a new cupola air-pollution control system for the Tyler, TX, plant. ETA handled mechanical and electrical installation for the system, too, which started up in early November.

The dry cupola APC package was designed to control emissions from a 55-tons/hour water-wall cupola with oxygen enrichment, and it includes a new combustion chamber, evaporative gas cooling, Escher recuperator, and an Escher air-to-air gas cooler prior to the four-module ETA 2000 Pulse-Jet Dust Collectors. The design ensures on-line cleaning.

According to Avilla, IN-based ETA Engineering, the APC system includes a continuous pre-coat system, that feeds dry chemicals to render the waste stream non-hazardous, and to aid in filtering cupola gases. ETA provided a dust-processing center, too, with a silo, and a mixer that pelletizes dust for disposal.

Reprints  |   Printer Friendly   |   Email a Friend
Metal Producing Review
Rating :
Your Email Address (optional) :
Comments (optional - 100 characters maximum) :
Note: the email address
is for internal use only.
It is not posted or shared.
Foundry Share Through Social Bookmarking